The Board of Trustees has chosen a furnace contractor and we are on his list. Temporary heaters are to be installed this weekend and that will help to dry out the building even more. Wood studs are @ 14.5%, not dry enough to insulate and sheetroock over yet. Electrical work continues, and the fire alarm system is temporarily reconnected. Loose floor tiles have been removed, so when the time comes, carpeting can be glued to a dry secure surface.
The Front Room looking towards the front hall & The Reference Room looking towards Knower Ave.